Hello All
We have to maintain a date in date specification (it will be always in Saturday-Last day of the week).We have a 28 days payroll cycle calendar available in the system. This date on whole available in Payroll calendar.
W1 = 06.07.2014 to 12.07.2014
W2= 13.07.2014 to 19.07.2014
W3= 20.07.2014 to 26.07.2014
W4= 27.07.2014 to 02.08.2014
How can we track the date maintained in the date specification for a sub type and the compare the week with payroll calendar. Then I need to take for a PCR
Regards
Senthu