Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 7790

Netweaver CE 7.1 ehpk1 upgrade to SP04 on MSCS

$
0
0

Hi

 

I am building our production environment.  I have installed NetWeaver CE 7.1 on a HA Cluster - using MSCS.  Both app instances are running fine, can failover and back etc. 

 

I am having issues upgrading to SP04.  I already did this on our DEV and QA standalone systems without issue. 

 

I am running this from the primary instance.

The JSPM bombs out when trying to synchronize bootstrap for the instance on the secondary instacne (host irlcvap0028).  The issue I think is that it is trying to run a command on the D:\ which is local to the secondary instance, so the primary instance cannot access it via D:\usr\sap.... the sync is successful on the primary instance (host irlcvap0027).  The log for SAP CONTROL, shows Permission denied.  

 

How do you upgrade to SP04 on a MSCS??  Is it different to a standalone upgrade?   I thought I could upgrade the primary instance, and then either upgrade the secondary instance, or copy the binaries.  I cannot find a procedure specific for MSCS environment.

 

Help appreciated - go live is next month!

Thanks

Rosie

 

 

I have copied in some logs below.

 

JSPM_MAIN_1_01.LOG

Process ID 24, name sapcontrol has been started.

Apr 8, 2011 12:26:32 PM [Info]:   Command line: D:\usr\sap\CRK\J00\exe\sapcontrol -nr 00 -host irlcvap0028 -function ParameterValue DIR_PROFILE

Apr 8, 2011 12:26:32 PM [Info]:   Standard out: D:\usr\sap\CRK\J00\j2ee\JSPM\log\log_2011_04_08_12_18_14\SAPCONTROL_PARAMETERVALUE_00_05.OUT

Apr 8, 2011 12:26:32 PM [Info]: Process ID 24 has been started.

Apr 8, 2011 12:26:32 PM [Info]: Waiting for process ID 24, name sapcontrol to finish.

Apr 8, 2011 12:26:32 PM [Info]: Process ID 24, name sapcontrol has been finished, exit code 0.

Apr 8, 2011 12:26:32 PM [Info]: Process ID 25, name sapcontrol has been started.

Apr 8, 2011 12:26:32 PM [Info]:   Command line: D:\usr\sap\CRK\J00\exe\sapcontrol -nr 00 -host irlcvap0028 -user IRLPROD\svc_miicluster <SecureField> -function OSExecute ""$Start_Program_01"" 0 300 sapcontrol_rmi_sync_bootstrap.log

Apr 8, 2011 12:26:32 PM [Info]:   Standard out: D:\usr\sap\CRK\J00\j2ee\JSPM\log\log_2011_04_08_12_18_14\SAPCONTROL_OSEXECUTE_00_01.OUT

Apr 8, 2011 12:26:32 PM [Info]: Process ID 25 has been started.

Apr 8, 2011 12:26:32 PM [Info]: Waiting for process ID 25, name sapcontrol to finish.

Apr 8, 2011 12:26:32 PM [Info]: Process ID 25, name sapcontrol has been finished, exit code 1.

Apr 8, 2011 12:26:32 PM [Error]: Unable to synchronize bootstrap for instance J00. The possible reasons: Kernel is older than expected.

 

 

SAPCONTROL_OSEXECUTE_00_04.OUT OSExecute

FAIL: Permission denied


Viewing all articles
Browse latest Browse all 7790

Trending Articles