Hi Experts,
We have done Archive material documents(MM_MATBEL) upto 31st December, 2012. Which we can see from Mb51 by selecting the option Read data from Archive in MB51 tcode. Now we are doing MC.9 stock report. But here in the Last movement date column the date before 01.01.2013 is not showing. But we need to see these. See the below image:
See the date started to show from last movement date 01.01.2013 after ascending it. Is it possible to show the year 2012 movement here from Archive ? If yes then how ?
Thanks
Asad